EUR

Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase

twin casing slurry pump vs single casing slurry pump

DOP350L Dredge Pump Eliminates Chemical Contamination - Pile Buck Magazine

    Project Summary

    Location: The Ebro river near Flix, Tarragona, Spain

    Period: Q4, 2011-Q4,2013

    Challenge: Removing contaminated lays of top soil and a hard layer below

    Solution:DOP350L, first with auger head then with cutter unit

    Contractor: Canlemar S.L. as subcontractor for FCC S.A.

    Wouter Beekman, Service Coordinator at Damen Dredging Equipment

    “The solution of switching between the various possibilities of the DOP – with the auger head, the cutter unit or as a booster station – was the key factor to the success of the job”.

    Years of uncontrolled production at a chemical plant had severely contaminated the Ebro River near Flix, Spain. The challenge was to remove the contaminated sediment without any turbidity and pumping it to a dewatering plant.

    Two DOP pumps provided the solution. The first one, a DOP350L was fitted out with an auger head and attached to a pontoon-based excavator. The auger head cut away the layers of contaminated sand and silt with high accuracy – the excavator had been fitted out with NAVGUARD positioning and survey sensors and software.

    When the top layer was removed, the cutter unit replaced the auger head as a hard sandy gravel layer was to be removed. The cutter force was required to break the soil; the mixture was pumped to the dewatering plant making use of another DOP pump which was in use as a booster station.

    Yet the contamination was even deeper, in relative coarse material containing large stones. Again, the dredge configuration was altered. The excavator was fitted out with its bucket, digging the stones out and dumping the material in a grit-topped barge. Larger stones were removed from the grid, all sand and gravel were pumped from the barge… using the DOP pump again.

  • Fast shipping
  • Home delivery
  • The promotion is underway
  • Free trial
  • 24/7 online
  • 30-day no-reason return policy
Contact us

Daniel Féau processes personal data in order to optimise communication with our sales leads, our future clients and our established clients.

Read more

Other related products

3 mini dredge pump kit

3 mini dredge pump kit

slurry lagoon pump

slurry lagoon pump

8 inch slurry pump4 inch slurry pump 900 psi

8 inch slurry pump4 inch slurry pump 900 psi

a centrifugal pump acts as a reverse of

a centrifugal pump acts as a reverse of

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.