EUR

Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase

4 inch slurry pump gasket

Hopper and Grab Dredgers - Rohde Nielsen

    Powerful and reliable hopper and grab dredgers

    Rohde Nielsen provides a wide range of hopper and grab dredgers tailored to accommodate specific and challenging requirements. Our fleet consist of specialised vessels designed to meet specific needs, and can perform very complex marine projects.

    Our trailing suction hopper dredgers are highly suitable for Coastal Protection, Land Reclamation, as well as Capital And Maintenance Dredging of ports and waterways.

    Equipped with advanced technology, our vessels employ various methods to deliver sand; We can either pump sand onto the beach using a floating or submerged pipeline, or pump the dredged material directly out over the bow of the ship to the fore shore, also known as The Rainbow Method. Thirdly, our vessels can place sand close to the shore with the split-function in the vessel’s bottom.

    Hopper and Grab Dredgers

    Hermod R, Balder R, Njord R, Ask R, Embla R, Thor R, Sif R, Brage R, Idun R, Freja R, Trud R, Magni R, Modi R, Viking R, Tjalfe R, Toste R

    Hopper Capacity 8,000m3

    Length overall 122.50m, Breadth 24.60m, Draught loaded 7.50m, Draught unloaded 5.20m, Dredging Depth 75.00m

    Hopper capacity 6,000m3

    Length overall 111.30m, Breadth 19.40m, Draught loaded 7.00m, Draught unloaded 3.80m, Dredging depth 35.00/65.00m

    Hopper capacity 6,000m3

    Length overall 111.30m, Breadth 19.40m, Draught loaded 7.00m, Draught unloaded 3.80m, Dredging depth 35.00/62.00m

    Hopper capacity 2,700m3

    Length overall 85.40m, Breadth 17.40m, Draught loaded 5.40m, Draught unloaded 2.90m, Dredging depth 32.00/52.00m

    Hopper capacity 2,700m3

    Length overall 85.40m, Breadth 17.40m, Draught loaded 5.40m, Draught unloaded 2.90m, Dredging depth 32.00/52.00m

    Hopper capacity 2,507m3

    Length overall 83.90m, Breadth 14.00m, Draught loaded 5.41m, Draught unloaded 3.47m, Dredging depth 25.00/28.00m

    Hopper capacity 2,173m3

    Length overall 80.00m, Breadth 13.80m, Draught loaded 4.87m, Draught unloaded 2.90m, Dredging depth 24.00/46.50m

    Hopper capacity 2,170m3

    Length overall 89.59m, Breadth 13.60m, Draught loaded 5.69m, Draught unloaded 4.10m, Dredging depth 30.00/49.50m

    Hopper capacity 2,035m3

    Length overall 79.00m, Breadth 14.00m, Draught loaded 4.50m, Draught unloaded 3.45m, Dredging depth 25.00/28.00m

    Hopper capacity 1,961m3

    Length overall 75.08m, Breadth 14.00m, Draught loaded 5.20m, Draught unloaded 3.50m, Dredging depth 28.00/34.00m

    Hopper capacity 1,570m3

    Length overall 75.49m, Breadth 12.80m, Draught loaded 3.80m, Draught unloaded 2.00m, Dredging depth 28.00/40.00m

    Hopper capacity 1,570m3

    Length overall 75.49m, Breadth 12.80m, Draught loaded 3.80m, Draught unloaded 2.00m, Dredging depth 28.00/40.00m

    Hopper capacity 1,393m3

    Length overall 67.05m, Breadth 12.80m, Draught loaded 3.80m, Draught unloaded 1.50m, Dredging depth 20.00/24.00m

    Hopper capacity 1,010m3

    Length overall 66.80m, Breadth 11.85m, Draught loaded 4.33m, Draught unloaded 2.85m, Dredging depth 20.00/24.00m

    Hopper capacity 789m3

    Length overall 57.50m, Breadth 14.80m, Draught loaded 3.45m, Draught unloaded 1.80m, Dredging depth up to 100.00m

    Hopper capacity 535m3

    Length overall 45.70m, Breadth 10.50m, Draught loaded 3.50m, Draught unloaded 2.20m, Dredging depth up to 100.00m

    Featured projects

    Purpose: Supplying of shell sand, dredged from a specific area, offshore at Owen Anchorage, West Australia…. Location:Owen Anchorage, Western Australia Scope:1,500,000 m³ annually Client:Cockburn Cement Ltd.Year:2018-2030

    Purpose: Dredging of temporary work channels and other various tasks… Location:Zealand, Denmark Scope:923,000 m3 Client:Storstroem Bridge Joint Venture I/S Year:2019-2023

    Purpose: To fortify the beach against winter storms from the Baltic Sea…. Location:Kolobrzeg (POL)Scope:180,000 m3 Client:Maritime Authority of Szczecin Year:2023

    Purpose: The project consisted of 5.4km of beach nourishment along Blåvand beach… Location:Danish West Coast (DEN)Scope:275,000 m3 Client:Danish Coastal Authority Year:2022-2023

    Purpose: To protect the beaches and coastline of the west coast… Location:Sylt (GER)Scope:1,111,111 m3 Client:Landesbetrieb für Küstenschutz, Nationalpark und Meeresschutz (LKN)Year:2023

    Purpose: To preserve and protect the beach natural environment and character…. Location:Stockton Beach, New South Wales (AUS)Scope:130,000 m3 Client:NSW Government Year:2023

    Purpose: Installation of 2,100 tons of rock intended for erosion protection… Location:Lillebælt (DEN)Scope:2,100 ton of rocks Client:BaneDanmark Infrastruktur Year:2023

    Purpose: Installation of 82 pcs of rock beds approx. 13×18 m. at 24 locations… Location:Courseulles (FRA)Scope:62,000 ton of rocks Client:Saipem S.A.Year:2023

    Purpose: Construction of an offshore 48” diameter pipeline… Location:Baltic Sea (GER)Scope:2,000,000m3 Client:Gascade Gastransport GmbH Year:2023-2024

    Purpose: Installation of protective layer of amour rock on the foundations for the offshore wind farms. … Location:Vesterhav (DEN)Scope:69,000 ton of rocks Client:Asso Subsea Limited Year:2023

    Purpose: Preparation for the arrival of a jackup vessel to repair a wind turbine generator… Location:Wikinger OWF (GER)Scope:22 pcs Client:Siemens Gamesa Year:2023

    Purpose: Maintenance dredging within the Port of Bunbury…. Location:Bunbury, Australia Scope:200,000 m³ annually Client:Southern Ports Authority Year:2018-2023

    Purpose: Secure a new power cable by installing a rock berm on top of the cable. … Location:Near Noss Head, Scotland (GBR)Scope:22,000 tons of rock Client:NKT Year:2022

    Purpose: Strengthening the European internal energy market…. Location:Denmark and Poland Scope:1,000,000 m3, 1,000 stones Client:Saipem Ltd Year:2021-2022

    Purpose: Dredging a 6 km long trench, at water depths differing from -3m to -30m…. Location:Hanö, Sweden Scope:3 x 6 km pipes and 6 km cable Client:NCC Sweden AB Year:2022

    Purpose: The quantity reclaimed was 200,000 m3 through a sinker line… Location:Föhr, Germany Scope:200,000 m3 Client:Landesbetrieb für Küstenschutz Year:2022

    Purpose: Dredging of upper siltated sand, expansion of rock bed area and installation of additional rock… Location:Esbjerg, Denmark Scope:25,000 dredged, 40,000 rock installed Client:Siemens Gamesa Year:2019-2020

    Purpose: 800,000 m3 of sand distributed on the beaches Kalutara, Angulana and Mt. Lavinia… Location:Kalutara, Angulana, Mt. Lavinia, Sri Lanka Scope:800,000 m3 Client:Coast Conservation Mgmt. Dept.Year:2020

    Purpose: Beach nourishment project to contain erosion and limit the risk of inundations…. Location:Montpellier, France Scope:180,000 m3 Client:Sète Agglopôle Méditerranée Year:2019-2020

    Purpose: Sand mining & pumping for reclamation, and stock piling… Location:Kerawalapitiya, Sri Lanka Scope:3,450,000 m3 Client:Sri Lanka Land Reclamation & Dev. Corp.Year:2018-2020

    Purpose: Various remediation campaigns at a wind turbine in Horns Rev 3… Location:Esbjerg, Denmark Scope:110,000 m3, 7,000t Rock Client:Vattenfall Vindkraft Horns Rev 3 P/S Year:2019-2020

    Purpose: Clearance of a total of 3,000 boulders has been cleared from the pipeline route… Location:Tolmount, United Kingdom Scope:3,000 Boulders, 50,000 m3 Clay Client:Saipem Ltd Year:2019-2020

    Purpose: Capital Dredging and securing slope of the Quay number 7…. Location:Paldiski, Estonia Scope:600,000 m3 Client:Ports of Tallinn Year:2019-2020

    Purpose: About 30,000 m3 of moraine soil needs to be removed and dumped in offshore dumping grounds…. Location:Klaipeda, Lithuania Scope:70,000 m3 Client:Klaipeda State Seaport Authority/BMGS Year:2020

    Purpose: Maintenance dredging at Pier 1; Pier 3 North and South; Pier 4 North and South… Location:São Luís, Brazil Scope:5,037,152 m3 Client:Vale SA Year:2015-2020

    Purpose: A long time charter contract for continuous maintenance dredging in entrance channel… Location:Berbice river, Republic of Guyana Scope:160,000,000 m3 Client:Bauxite Company of Guyana Inc. (BCGI)Year:2011- 2020

    Purpose: Expansion of Hanstholm Harbor, in addition to further deepening of the existing fairway… Location:Hanstholm, Denmark Scope:280,000 m3 hard lime, 740,000 m3 sand Client:Per Aarsleff A/S Year:2018-2020

    Purpose: Deepening and widening of the harbor and entrance channel located at the Great Barrier Reef Marine Park… Location:Cairns, Australia Scope:750,000 m3 Client:Ports North Year:2019

    Purpose: Cleaning existing rock beds of 24,000m3 of sand… Location:Esbjerg, Denmark Scope:33,600 m3 Client:Siemens Gamesa Renewable Energy Year:2019

    Purpose: A long-term Coastal Protection contract at the Danish West Coast … Location:West Coast of Jutland, Denmark Scope:Between 950,011 m3 and 3,470,335 m3 Client:Danish Coastal Authority Year:2012-2019

    Purpose: Dredging 1,000,000m3 of sand available in the access channel to the port of Lisbon… Location:Almada – Caparica, Portugal Scope:1,000,000 m3 Client:APL-Administracão do Porto APA Year:2019

    Purpose: Installation of 4 export cables totaling 300 km in length from offshore wind farms… Location:Lubmin, Germany Scope:330,000 m3 Client:Prysmian & 50 Hertz Year:2017-2019

    Purpose: Trench dredging and backfilling works… Location:Eemshaven, Netherland Scope:4,656,000 m3 or 2,600,000 m3 in 5 sections Client:Prysmian Power Link, TenneT and Energinet Year:2018-2019

    Purpose: Increasing navigation depth and facilitating quality fill… Location:Rønne Port, Denmark Scope:900,000 m3 Client:Per Aarsleff A/S Year:2018-2019

    Purpose: Deepening of the shipping channel to 10.4 meters and a width of 70 meters… Location:Vordingborg, Denmark Scope:1,800,000 m3 sand, 1,610,000 of boulder clay Client:Munck Havne og Anlæg A/S Year:2018-2019

    Purpose: installation of 2,500 GSCs (geotextile sand containers) for offshore wind turbines…. Location:Nissum Bredning Scope:2,500 GSCs Client:Siemens Gamesa Renewable Energy Year:2018

    Purpose: Increasing navigation depth and facilitating quality fill… Location:Frederikshavn, Denmark Scope:3,220,000 m3 Client:Port of Frederikshavn Year:2016-2018

    Purpose: Pre-Pipelay trench dredging works required for the 3.75km Outfall pipe…. Location:Anchorsholme, United Kingdom Scope:350,000 m3 Client:J Murphy & Sons Ltd Year:2017

    Purpose: Floatation channels for offshore installation barges… Location:Nissum Bredning Scope:220,000 m3 Client:Per Aarsleff A/S Year:2017

    Purpose: Beach and foreshore nourishment on the Dutch coast… Location:Dutch Coastline, The Netherlands Scope:10,377,900 m3 Client:Rijkswaterstaat PPO Year:2013-2017

    Purpose: Dredging, Rainbowing and Bottom-dumping on the Gold Coast… Location:Gold Coast, Australia Scope:3,000,000 m3 Client:Council of the City of Gold Coast Year:2017

    Purpose: Offshore sand mining and beach nourishment… Location:Marawila, Sri Lanka Scope:800,000 m3 Client:Coast Conservation Mgmt. Dept.Year:2016-2017

    Purpose: 1,100,000 cubic meters of sand were dredged to reclaim the land areas behind the quays… Location:Esbjerg, Denmark Scope:1,100,000 m3 Client:Esbjerg Port Year:2016-2017

    Purpose: NorNed Lowering and Remedial Burial using Mass Flow Excavation… Location:The Netherlands Scope:17 km Client:TenneT TSO B.V.Year:2016

    Purpose: Design, planning and construction of the new fairway to Vordingborg… Location:Vordingborg, Denmark Scope:220,000 m3, including design and construction Client:Banedanmark Year:2016

    Purpose: Deepening and widening the entrance channel and port of Tauranga… Location:Tauranga, New Zealand Scope:5,300,000 m3 Client:Port of Tauranga Limited Year:2015-2016

    Purpose: Maintenance dredging in Devonport, Tasmania… Location:Tasmania, Australia Scope:260,000 m3 Client:Tasmanian Ports Corporation Pty Ltd Year:2015

    Purpose: Trench dredging, pre-sweep and backfilling at the East Yorkshire Coast… Location:East Yorkshire Coast (UK)Scope:7 km of trench Client:Saipem Ltd Year:2012

  • Fast shipping
  • Home delivery
  • The promotion is underway
  • Free trial
  • 24/7 online
  • 30-day no-reason return policy
Contact us

Daniel Féau processes personal data in order to optimise communication with our sales leads, our future clients and our established clients.

Read more

Other related products

8 inch centrifugal pump

8 inch centrifugal pump

c self priming slurry pump for sale

c self priming slurry pump for sale

i cutter suction dredge pump parts

i cutter suction dredge pump parts

submersible slurry pump hs code

submersible slurry pump hs code

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.