EUR
en
ZJH High Lifting Double Case Slurry Pump
ZJH Mining Pump ,High Pressure Slurry Pump selection according the properities of a slurry. The volume of slurry to be transported must be reliably determined before defining a slurry pumping application. Without a clear understanding of the volumetric requirement and possible variations of demand, it would be impossible to adequately compute a pumping system solutions.Slurry Pump Metal Lined work widely.
HH chrome alloy pump,For slurry pumping, the flow rate is determined by a correlation between three factors: 1) the solids SG, 2) the tonnage of solids required to be pumped, 3) the concentration of these solids within the slurry mixture. These three factors need to be determined prior to selecting any slurry pump. An example of how the flow rate can be calculated, using these values, is given in select pump type & materials.
Machinery Gold Factory Industrial pump with metal lined. Wet endded parts replace easily and has longer term service.
Type Allowable Mating Max.Power (Kw)Clear Water Performance Impeller Capacity m³/hr Head m Speed rpm Max Efficiency %NPSH m Nos of Vane Diameter mm 1.5/1 C-HH 30 16.2-34.2 25-9 1400-2200 20 2-5.5 5 330 3/2 D-HH 60 68.4-136.8 25-87 850-1400 47 3-7.5 5 457 4/3 E-HH 120 126-252 12-97 600-1400 50 2-5 5 508 6/4 F-HH 560 324-720 30-118 600-1000 64 3-8 5 711 8/6 S-HH 560 468-1008 20-94 500-1000 65 4-12 5 711
Main Part Number at the Drawing 032: Frame Plate 060: Intake Joint 132: Discharge Joint 083: Throatbush 110: Volute Liner 147: Impeller 122: Stuffing Box Seal 013: Cover Plate 124: Volute Liner Seal 041: Frame Plate Liner Insert
Q1.How to gurantee the quality? A: All our pump and spare parts pass ISO 9001:2008 and CE certificate. Warranty time is 12 month except Wet End Parts.
Q2.Your company product range? A:Centrifugal Pump, Slurry pump, Sand Pump , Gravel Pump, Dredging Pump, Clean Water Pump, Sewage pump, Chemical pump, Single stage pump, Double suction pump, Industry pump, Paper pulp pump, Mud pump, Sludge pump, etc
Q3. Delivery time: A: For the Common Slurry pump and spare parts , the delivery time within 7-15 days. Special material and OEM production is longer.
Bookmark
Daniel Féau processes personal data in order to optimise communication with our sales leads, our future clients and our established clients.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.