EUR
en
FloodStop Pre-Plumbed Sewage Pump Systems are fully plumbed and ready to install with a sewage pump, sewage pump basin and basin cover, check valve and inlet hub included. The interior plumbing uses heavy duty schedule 80 PVC pipe for durability you can trust. A specially designed threaded socket flange allows for quick connection of the discharge pipe to the cover. This system is ready to install in new or existing bathrooms.
Bookmark
Daniel Féau processes personal data in order to optimise communication with our sales leads, our future clients and our established clients.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.