EUR

Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase
Excellent supplier product showcase

sump slurry pump 5 gallon

Technical visit to the construction site of San Shek Wan Sewage Treatment Works (Vol 51 Oct 2023) - The Hong Kong Institution of Engineers

    The group at the site of San Shek Wan Sewage Treatment Works

    The CV Division, the Drainage Services Department, Binnies Hong Kong Ltd and the Kwan Lee and Chun Wo Joint Venture jointly organised the captioned visit on 22 July 2023.

    The event began with a warm welcome by the organisers. The participants were then given an informative introduction on the project, including the construction of a submarine outfall by Horizontal Directional Drilling (HDD) and innovative measures adopted in the project. The participants had a tour of the site after the presentation.

    The project involves the construction of a secondary sewage treatment works at San Shek Wan in South Lantau, a sewage pumping station at Pui O, plus 1.4 km long twin submarine outfalls with an outer diameter of 350 mm for disposal of treated effluent from the project, and finally the construction of about 5.3 km of village sewage system and ancillary works along South Lantau Road, Chi Ma Wan Road and at Pui O Lo Uk Tsuen.

    The outfall is constructed by the HDD method to minimise dredging and other construction activities in the water. It is located approximately 60 m below the seabed and constructed by a 2-way forward drilling operations on both the land and sea sides.

    The feedback from the visitors was positive, with many expressing how much they enjoyed and learnt from the visit. They appreciated the opportunity to see the setup and the construction plant for the HDD works, the innovative measures and learn about the engineering principles behind them. The visit was also a great opportunity for them to have a better understanding of how a public works project could benefit the community as well as the environment.

    The visit was a success, and the organisers were thrilled to have the opportunity to showcase the San Shek Wan project in person. The physical site visit provided attendees with a unique opportunity to learn more about the project and acquire a deeper understanding of the engineering involved from a first-person perspective.

  • Fast shipping
  • Home delivery
  • The promotion is underway
  • Free trial
  • 24/7 online
  • 30-day no-reason return policy
Contact us

Daniel Féau processes personal data in order to optimise communication with our sales leads, our future clients and our established clients.

Read more

Other related products

5 fgd pump oil

5 fgd pump oil

self priming slurry pump kit for sale

self priming slurry pump kit for sale

c cutter suction dredge pump parts

c cutter suction dredge pump parts

6 metal slurry pumps

6 metal slurry pumps

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.